Reverse Due Date Calculator
The Reverse Due Date Calculator computes reverse due date from the relation days from today to LMP = (due date serial day - 280) - today serial day. It takes 6 inputs (due date year, due date month 1 to 12, due date day 1 to 31, today year, today month 1 to 12, today day 1 to 31) and returns the reverse due date. Because this is a pure mathematical or physical formula rather than a jurisdiction-specific rule, the result never changes over time: the same inputs always produce the same answer, so you can rely on it whether you are checking homework, sizing a design, or sanity-checking another tool. Enter your values in the fields below and the result updates instantly; you can also share a permalink that pre-fills the exact calculation, which is useful for teaching, reports, or collaboration. For example, with due date year = 2026, due date month 1 to 12 = 10, due date day 1 to 31 = 8, today year = 2025, today month 1 to 12 = 12, today day 1 to 31 = 1, the reverse due date works out to 31, and the worked example further down the page shows every step so you can follow the arithmetic and reproduce it by hand. The method is the standard form documented by MedlinePlus Prenatal Care, and the figure above each result carries the date it was last verified. This tool is general information and is not a substitute for professional engineering, medical, financial, or scientific advice; always check critical results against the primary source and your own judgement.
With Due date year = 2026, Due date month 1 to 12 = 10, Due date day 1 to 31 = 8, Today year = 2025, Today month 1 to 12 = 12, Today day 1 to 31 = 1, the result is 31.
Applies to: any numeric inputs. Method source: MedlinePlus Prenatal Care, checked 2026-06-23.
The formula
days from today to LMP = (due date serial day - 280) - today serial day
Worked example
With Due date year = 2026, Due date month 1 to 12 = 10, Due date day 1 to 31 = 8, Today year = 2025, Today month 1 to 12 = 12, Today day 1 to 31 = 1:
- LMP serial = due date serial - 280 days
- days from today to LMP = LMP serial - today serial = 31
- Reverse Due Date = 31
This worked example is one of the automated golden-value tests this calculator must pass before it can publish.
What this assumes
- Inputs are real numbers in the units shown.
- The result is the exact value of days from today to LMP = (due date serial day - 280) - today serial day; general information, not professional advice.
Frequently asked questions
What formula does this use?
days from today to LMP = (due date serial day - 280) - today serial day, the standard form documented by MedlinePlus Prenatal Care.
Does the result ever change over time?
No. This is a pure formula with no external rate, so the same inputs always give the same result.
Official sources and verification
- Method: MedlinePlus Prenatal Care, checked 2026-06-23.
Reviewed by the CalculatorHub team, edited by James Graham, 2026-06-23. See our methodology. General information, not professional advice.